Phase: Equipment Ordered
Status: On Schedule
Project Summary: Furnishing and installing full color LED double sided message center sign, fully operational and complete.
Documents:
Funding: Equipment and installation was budgeted in the 2025 Town of Amenia General Fund.
Estimated Completion: July 2025
Phase: Design Development / Construction Documents
Status: On Schedule
Project Summary: This project includes, but is not limited to: extensive 5 acre site work (clearing, grading, electrical service, sanitary sewer, well, storm-water management, driveway); construction of an approximate 12,620 square foot, 6 double bay garage building with office/breakroom, mechanical bay with lift, and wash bay; construction of a 60’ x 80’ salt shed and attached storage building (4 enclosed bays and 2 open bays); construction of a fuel station (diesel and gas) and installation of perimeter fencing.
Documents:
- Design Development Plan Set
- Engineer Presentation: Design Development, Cost Estimates & Next Steps
- Feasibility Study Presentation
- Feasibility Study - March 19, 2024
Funding: Design Development, Construction Plans and Bidding Documents are funded by American Rescue Plan Act of 2021 (ARPA) funds award to the Town of Amenia.
Estimated Completion: Construction Drawings and Bidding Document – Early Fall 2025
Phase: Design Development / Construction Documents
Status: On Schedule
Project Summary: This project includes, but is not limited to, removal and replacement of the Lavelle Road Pump house with a pre-fabricated Pump House (including micron filtration and treatment) set on a new concrete slab; raising of Well Heads 4 and 4A and perimeter fencing.
Documents:
Funding: Design Development, Construction Plans and Bidding Documents are funded by American Rescue Plan Act of 2021 (ARPA) funds award to the Town of Amenia.
Estimated Completion: Summer 2025
Phase: Under Construction (PAUSED)
Status: Delayed due to obtaining NYSDOT specific concrete.
Project Summary: This project includes the installation of approximately 864 feet of 5-foot-wide concrete sidewalk and curbing located along portions of Route 44 in the Town of Amenia. The project may include, but not be limited to, saw cutting; milling; concrete and asphalt removal and disposal; the installation of concrete curbing, sidewalk, and ADA accessible ramps; removal and disposal of existing drainage structures and pipe; the installation of pre-cast concrete drainage structures and pipe; the installation of wooden split rail fence; and paving as indicated in the contract documents.
Documents:
Funding: Dutchess County Community Development Block Grant, American Rescue Plan Act of 2021 (ARPA) funds award to the Town of Amenia and a State and Municipal Facilities Program (SAM) Grant Administered by the Dormitory Authority of the State of New York (DASNY).
Estimated Completion: August 2025
Phase: Equipment Installation
Status: On Schedule
Project Summary: This project includes removal and disposal of existing play equipment; purchase and assembly of Little Tikes Commercial Playground Equipment at Beekman Park.
Documents:
Special Thanks: Community volunteers DJ Reilly, Shawn and Richie Howard and Josh Ahearn for disassembling and removing the old play equipment; and Welsh Sanitation for free disposal.
Funding: Park & Recreation Savings Account which is funded by a portion of Cell Tower Revenue received by the Town of Amenia.
Estimated Completion: July 2025
Phase: Equipment Ordered
Status: On Schedule
Project Summary: This project includes, but is not limited to, furnishing and installation of two (2) EV charging stations and parking lot lining at the Harlem Valley Rail Trail parking lot on Depot Hill Road.
Documents:
Funding: Municipal Zero-Emission Vehicle (ZEV) Infrastructure Grant administered by The New York State Department of Environmental Conservation (DEC).
Estimated Completion: August 2025